kestrel7e7
Medic
- Joined
- Jan 16, 2007
- Messages
- 24
- Reaction score
- 2
The large dam at the end of the Route Kanal chapter is meant to be a hydroelectric powerplant for Black Mesa East but I though it was a bit odd that it can only hold back a few metres of water.
The dam isn't overflowing, yet there is the sound of rushing water (comparable to a torrent) near the overflow gate switch and a mist at the bottom of the dam.
The water outlet for the hydroeletric plant is opposite Black Mesa East which is offset from the dam wall itself but there is no water intake anywhere in the dam itself and there doesn't seem enough water to satisfy, what I assume to be, power hungry Black Mesa teleportation experiments.
There are no connecting rivers to the dam section (only two drains), so how did the two large boats get there?
Can anyone make any sense of this? Is it deliberate or simply casual map design?
The dam isn't overflowing, yet there is the sound of rushing water (comparable to a torrent) near the overflow gate switch and a mist at the bottom of the dam.
The water outlet for the hydroeletric plant is opposite Black Mesa East which is offset from the dam wall itself but there is no water intake anywhere in the dam itself and there doesn't seem enough water to satisfy, what I assume to be, power hungry Black Mesa teleportation experiments.
There are no connecting rivers to the dam section (only two drains), so how did the two large boats get there?
Can anyone make any sense of this? Is it deliberate or simply casual map design?